Recently Awarded Project Listings
Each listing includes a project summary, original bid date, contact, and direct document links.
No matching projects found. Try clearing the search or changing the status filter.
In Progress
Cornell University Rhodes B50 Laboratory Renovation
Original Bid
August 27th, 2026 at 2:00PM
Single Prime
The project includes the interior renovation of Rhodes Hall B50 Laboratory located in the Rhodes Hall basement. There is work outside of the areas described above, to support the Work. The scope includes all construction required to accomplish the Work, as shown on the Drawings, including but not limited to the following: 2. Provide temporary partitions at work areas. Maintain proper egress at all times. Protect existing finishes to remain. 3. Demolish, remove, or salvage select existing construction. Demolish existing finishes and existing mechanical and electrical systems as indicated on the Drawings. 4. Provide new finishes, including flooring and wall paint. Provide new non-rated gate and framed support. Provide speed rails for motion capture support. Provide a net curtain and track. 5. Provide limited mechanical work which includes, but is not limited to, new mechanical diffusers and piping. 6. Provide new or adjust electrical systems in the project area required for complete installation. This includes but is not limited to adjustments to power distribution. Relocate the transformer.
Project Manager Josh Mosolf x6360
Addenda: No Addenda
Back to project index
Awarded
Binghamton University Baseball Complex Archway
Original Bid
August 26th, 2026 at 2:30PM
Single Prime Contract
The project consists of constructing a monumental stone-and-steel entrance archway between the existing baseball stadium and field house. The work includes foundations, reinforced concrete piers, CMU and stone veneer, precast architectural concrete, custom structural steel framing, fabricated lettering, associated sitework, landscaping, restoration, and an additive electrical alternate for architectural lighting and illuminated lettering.
Project Manager Luke Brown x6384
Back to project index
In Progress
Owego Free Academy / Middle School & Apalachin Elementary School (OACSD) - Capital Project Phase 4
Original Bid
May 5th, 2026 at 1:00PM
Contract No. 1 - General Construction.
Project includes Multi-building capital improvements including selective demolition, roofing, doors, finishes, athletic upgrades, site utilities, HVAC, plumbing, electrical, and exterior improvements.
Project Manager Lloyd Friedah x6392
Back to project index
In Progress
Elmira CSD Elementary Schools 2026 Renovations
Original Bid
April 9th, 2026 at 2:00PM
General Construction Contract
The Elmira City School District Elementary Schools 2026 Renovations project includes renovations at Beecher Elementary, Coburn Elementary, Fassett Elementary and Ernie Davis Academy. The work includes demolition, asbestos abatement, roofing replacement, interior renovations, mechanical and electrical upgrades, plumbing improvements and site improvements including paving and utilities.
Project Manager Lloyd Friedah x6392
Back to project index
In Progress
Elmira CSD EHS 2025 Capital Improvements
Original Bid
February 27th, 2026 at 2:00PM
General Trades Contract
Work consists of phased interior renovations and selective demolition within Elmira High School, executed primarily during the summer recess. Work includes removal of existing finishes and partitions, new framing and gypsum board assemblies, firestopping and life-safety upgrades, concrete slab infill and patching, masonry infill, miscellaneous structural steel, new doors, frames, hardware, interior glazing, ceilings, flooring, casework, specialty items, and associated architectural finishes.
Project Manager Lloyd Friedah x6362
Back to project index
In Progress
Cornell University McFaddin Buttress Repair + Leaning Chimney Removal
Original Bid
February 3rd, 2026 at 2:00PM
Single Prime Contract
1. Work to include rebuilding sections of buttresses with new stone, miscellaneous stone replacement, re-pointing, and flashing at McFaddin Tower. 2. Take down nine (9) brick chimneys and provide weather-caps - (allow for existing flues to be maintained).See project documents for full scope of work and details.
Project Manager Brian Edwards x6359
Back to project index
In Progress
Afton CSD 2024 Capital Project - Phase 1
Original Bid
December 22nd, 2025 at 1:00PM
General Trades Contract
The project includes multi-area renovations of instructional spaces (CTE Agriculture Labs, Library/Media Center, Classroom 133), performing arts spaces (Chorus Room), and major athletic facilities (Gymnasium, locker rooms, pool basement).See project documents for full scope of work and details.
Project Manager Lloyd Friedah x6392
Back to project index
In Progress
Cornell University Clara Dickson Hall Roof Repairs Phase 2, 3, & 4
Original Bid
November 25th, 2025 at 3:00AM
Single Prime Contract
Phase 1 work addressed site drainage and grading around the Clara Dickson Hall building. Roof repair work during Phases 2, 3 and 4 will occur during the summers of 2026, 2027 and 2028, and include the following: 1. Remove, Salvage, and Reinstall existing slate roofing 2. Install new slate roofing 3. Provide Ice Protection 4.New Flashing Systems 5. Wood Deck Replacement 6.Dormer Wood Siding Repairs 7.Isolated Repairs to Wood Cornice 8.Rebuilding of Masonry Chimneys 9.Masonry Repairs at fire separation walls and vicinity of cornice
Project Manager Josh Mosolf x6360
Back to project index
In Progress
Alfred State Renovate Pioneer Center
Original Bid
September 24th, 2025 at 2:00PM
General Construction Contract
Renovation and addition to Pioneer Center. The project includes the complete demolition (and abatement) of the Pioneer Center's interior with a fitout of a modernized interior and building systems. Repairs to be made to the building's exterior including exterior walls, windows, doors and a new roof. See project documents for details and full scope of work.
Project Manager John Mahon x6356
Back to project index
In Progress
NYS Fire Academy Provide Elevator Addition and Modernize Existing Elevator
Original Bid
July 31st, 2025 at 2:00PM
General Trades Contract
Provide Elevator Addition and Modernize Existing Elevator at New York State Academy of Fire Science located at 600 College Avenue, Montour Falls, New York. OGS Project No. 46123-C. See project documents for details and scope of work.
Project Manager Luke Brown x6384
Back to project index
In Progress
Cornell University Renovate Livestock Pavilion for Surge Space Phase 2
Original Bid
July 2nd, 2025 at 2:00PM
General Trades Contract
Renovate approximately 15,400 sf of the Livestock Pavilion into surge space for future laboratory and office use. Work includes construction of a second-floor addition within the existing building volume, including associated concrete foundations and structural steel. It also involves improvements to the exterior building envelope to include replacement of the lower slate roof, removal and/or replacement of exterior doors and storefront systems, upgrades to exterior walls for energy performance and repairs to historic wood windows and wood trim. The scope includes construction of interior partitions, flooring, ceilings, casework, laboratory equipment, mechanical, electrical, plumbing, fire protection and audio-visual systems. Exterior work will also include construction of concrete sidewalks, plantings, and modifications of/upgrades to storm drainage systems.
Project Manager Ian Tuttle x6372
Back to project index
In Progress
SUNY Alfred State College of Technology (SUCF) Renovate Agriculture Science Building
Original Bid
June 18th, 2025 at 2:59PM
Single Prime Contract
SUCF Project # 221033-00. The work of this single bid project includes the gut demolition, envelope replacement and interior fit out of the approximately 54,000sf Agriculture Science Building, including the roof. The work includes, but is not limited to, brick envelope demolition and reconstruction, concrete slab demolition and removals, asbestos abatement, cutting and patching, concrete, masonry, structural steel, steel stairs, miscellaneous metals, railings, misc. carpentry, millwork, thermal protection, sealants, doors and frames, aluminum storefronts/entrances, hardware, finishes, acoustic wall/ceiling panels, wall coverings, ceilings, metal studs and GWB partitions, flooring, EPDM Roofing, roof pavers, site utilities, sitework, mechanical, electrical, fire protection and plumbing.
Project Manager John Mahon x6356
Back to project index
In Progress
Cornell University - Renovate 2nd - 5th Floor at King-Shaw Hall (SUCF)
Original Bid
May 13th, 2025 at 2:59PM
General Trades Contract
Reconfigure and repurpose the floors of King-Shaw Hall from a Conference Center and events space to a vibrant hub for ILR (Industrial Labor & Relations) student services on the second level, and a new administrative space for students and visitors to the Brooks School. The new configuration will continue to serve as a connection between adjacent ILR spaces located north and south of King Shaw Hall – Dolgen Hall and ILR Research Building
Project Manager Brian Edwards x6359