Recently Awarded Projects

Below are projects were recently awarded (or Streeter Associates is the apparent low bidder). If you have any questions about these projects, please call (607) 734-4151 and ask to speak to the Estimator that is handling the project that you are interested in. If you have any problems downloading the project documents, contact Rob Stanton at (607) 734-4151 extension 6354. Use the link to the right to see a list of projects that we are currently bidding.

Cornell University Wilson Synchrotron Laboratory SLAC Power Supply and Autotransformer Installation - APPARENT LOW
Description: 1. Install new, Owner-supplied Stanford Linear Accelerator (SLAC) power supply and autotransformer on to existing Wilson Synchrotron Laboratory outdoor transformer yard including: a. Foundation reinforcement in the cryogenic support room underneath the transformer yard consisting of steel beams, concrete foundations and concrete coring and steel framing for wall-mounted equipment. b. Concrete slab on grade. c. New electrical service and control wiring including 13.2kVAC, 60kVDC, 208VAC, control power and control signals. d. New illuminated exit signs and emergency lighting packs. e. Install two new egress frames and doors leading from the transformer yard to the 4th story mechanical room including outdoor awning above east door. f. Storm water main replacement inside of the cryogenic support room.
Bid Due: January 15th, 2020 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 Addendum 2
Project Estimator: Brian Edwards x6359

Canisteo-Greenwood CSD Capital Improvements Project - AWARDED
Description: Renovation and addition work on High School, Elementary School Bus Garage and Concession Stand. See project documents for project details and scope of work.
Bid Due: December 19th, 2019 at 3:30PM
Project Drawings: Download
Project Specifications (Volume 1): Download
Project Specifications (Volume 2): Download
Addenda: Addendum 1 | Addendum 2 | Addendum 3
Project Estimator: Nick Fabrizi x6364

Lansing CSD Additions, Alterations and Reconstruction - AWARDED
Description: General Construction Contract for the Additions and Alterations to Elementary School, Reconstruction to High School, Middle School, Technology Building, Former District Office, Grounds Building, Bus Maintenance Garage. Please review the project documents for the scope of work and project details. SED NOs. 61-08-01-04-0-003-018, 61-08-01-04-0-004-026, 61-08-01-04-0-001-021, 61-08-01-04-0-002-006 ,61-08-01-04-1-005-005, 61-08-01-04-3-013-003 and 61-08-01-04-5-006-011.
Bid Due: December 3rd, 2019 at 3:00PM
Project Drawings: Download
Project Specifications (Volume 1): Download
Project Specifications (Volume 2): Download
Addenda: Addendum 1
Project Estimator: Mike Muldoon x6387 and Brian Paul x6372

Rehabilitate Elevators Elmira Psych Center (OGS) - AWARDED
Description: General Construction Contract (M3119-C) for the rehabilitation of elevators in Buildings 3, 4, 5, 6, 7, and 9 of the Elmira Psychiatric Center at 100 Washington Street in Elmira.
Bid Due: November 20th, 2019 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2
Project Manager: John Mahon x6356

Arnot Health Emergency Department Renovation and Expansion - AWARDED
Description: The Work includes renovation and addition to the existing Emergency Department, which includes includes an Observation Unit, Administration Wing, new Lobby,Waiting Area, and new drop-off and ambulance canopies.
Bid Date: October 31st, 2019
Project Drawings (General): Download
Project Drawings (Demolition): Download
Project Drawings (Civil): Download
Project Drawings (Structural): Download
Project Drawings (Architectural): Download
Project Drawings (HVAC): Download
Project Drawings (Plumbing): Download
Project Drawings (Fire Protection): Download
Project Drawings (Electrical): Download
Project Drawings (Technology): Download
Project Drawings (Volume 1): Download
Project Specifications (Volume 2): Download
Project Specifications (Volume 3): Download
Addenda: Addendum 1 Addendum 2 Addendum 3
Project Manager: Mike Muldoon x6387

Cornell High Rise 5 Upgrades Elevator Replacement - AWARDED
Description: 1. Replacement of two elevators 2. Replacement of the Elevator Machine Room roof and the addition of a new roof hatch 3. Asbestos abatement associated with the elevator replacement 4. Structural modifications associated with the elevator replacement 5. Mechanical, electrical, and plumbing modifications to accommodate the elevator replacement.
Bid Due: October 23rd, 2019 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1
Project Estimator: Don Rottmann x6361

Cornell Barton Hall Floor Refinishing - AWARDED
Description: 1. Replace stair treads and risers on the three (3) west stairwells. 2. Paint stair structures. 3. Provide new resinous floor coating system on ground floor. 4. Provide entry area vestibule walk off carpet. 5. Provide temporary protections as required to complete the work.
Bid Due: September 12th, 2019 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2
Project Manager: John Jeter x6370

Cornell Snee Hall Mass Spectrometer Installation Ventilation - AWARDED
Description:Remove roof top exhaust fan that serves instruments in 4158B and 4160A and replace with a larger fan with a VFD. New fan will provide exhaust for existing and proposed instruments in rooms 4158B, 4160A and 4160B. Remove and replace as well as install new ductwork, coil, devices and control as shown on drawings to support the required ventilation for the 3 lab spaces.
Bid Due: September 3rd, 2019 at 2:00PM
Project Drawings: Download
Project Specifications (Asbestos Report): Download
Addenda: Addendum 1 | RFI Responses
Project Manager: Lloyd Friedah x6392

Tompkins County Sub-Residency Bldg & Site NYS DOT - AWARDED
Description: This project includes new building construction of the NYSDOT Tompkins County Sub-Residency Building as well as site development and construction that includes asphalt concrete pavement, drainage, water & sanitary sewer work. The new NYSDOT facility will consist of office space, workshop space, truck parking and salt storage. The approximate square footage of the various structures are as follows: subresidency maintenance building (30,000 SF), cold storage (5,000 SF), salt barn (8,200 SF), hopper building/covered lean-to (2,500 SF). NYS DOT #D264050
Bid Due: August 14th, 2019 at 10:30AM
Project Drawings: Download
Project Specifications (Volume 1): Download
Project Specifications (Volume 2): Download
Project Specifications (Volume 3): Download
Project Specifications (Volume 4): Download
Project Specifications (Volume 5): Download
Project Specifications (Volume 6): Download
Project Specifications (Volume 7): Download
Project Specifications (Volume 8): Download
Addenda: Amendment 1 | Amendment 2 | Amendment 3 | Postponed | Ammendment 4 | RFI Response 8-7-19 - Spec Sections 033543 and 124813 | Amendment 5 | Amendment 6
Project Manager: John Mahon x6356