Below are projects were recently awarded (or Streeter Associates is the apparent low bidder). If you have any questions about these projects, please call (607) 734-4151 and ask to speak to the Estimator that is handling the project that you are interested in. If you have any problems downloading the project documents, contact Rob Stanton at (607) 734-4151 extension 6354. Use the link to the right to see a list of projects that we are currently bidding.

Cornell University Replace Roofing & Ventilation - Tower Road East Greenhouses SUCF #161038 - APPARENT LOW
Description: 1. Replacement of greenhouse roof system glass 2. Modifications to greenhouse roof structures 3.Replacement of greenhouse roof ventilation systems 4. Asbestos abatement associated with the removal of existing greenhouse roof systems 5. Electrical work to support greenhouse roof system replacement
Bid Due: March 26th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2
Project Estimator: Nick Fabrizi x6364
Submit Quote to: Quotes@StreeterAssociates.com

Cornell University Stimson Hall Renovations for McGraw Enabling - APPARENT LOW
Description: Reconfigure existing office and classroom spaces to be used as same function (no change of occupancy). The work area primarily consists of interior renovations on the west end of the existing building on the first and third floors and the east end on the second floor. Abatement of hazardous materials associated with the demolition scope is included based on the level of alteration within each existing space. Existing building systems shall be modified or extended to accommodate reconfiguration of interior walls and doors.
Bid Due: March 21st at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1
Project Estimator: Nick Fabrizi x6364
Submit Quote to: Quotes@StreeterAssociates.com

Cornell Bradfield Hall G12 Growth Chamber Installation - AWARDED
Description: The project will convert Room G12 into a consolidated growth chamber facility, involving the installation of mechanical and electrical infrastructure tailored for the space. This will include the creation of a dedicated process loop to support the installation of three pre-purchased Percival reach-in chambers. Moreover, the infrastructure design allows for the seamless incorporation of six future reach-in chambers.
Bid Due: January 30th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1 |Addendum 2
Project Manager: Ian Tuttle x6372
Submit Quote to: Quotes@StreeterAssociates.com

Cornell University Wilson Lab Beamline Enabling Project Phase 3 - AWARDED
Description: 1. Install mechanical infrastructure in support future beamline 2. Install electrical infrastructure in support of future beamline 3. Install plumbing infrastructure in support of future beamline 4. Fabricate and install equipment platform 5. Install life safety sprinkler/FA extensions off existing system as required 6. Install code related items as required. See project documents for details and scope of work.
Bid Due: January 23rd at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1 |Addendum 2
Project Manager: John Mahon x6356
Submit Quote to: Quotes@StreeterAssociates.com

South Seneca CSD 2022 CIP Improvements - AWARDED GC CONTRACT 104
Description: General Trades Contracts 103 and 104. Capital Improvements Project for work at Ovid Junior and Senior High School, Interlaken Elementary School, New Transportation Facility and Existing Transportation Facility. See project documents for details and scope of work.
Bid Due: January 18th at 2:30PM
Project Drawings (Volume 1): Download
Project Drawings (Volume 1): Download
Project Specifications (Volume 1): Download Project Specifications (Volume 2): Download Project Specifications (Volume 3): Download
Addenda:Addendum 1 |Addendum 2 |Addendum 3 |Addendum 4 |Addendum 5
Project Manager: Ian Tuttle x6372
Submit Quote to: Quotes@StreeterAssociates.com

Cornell University Replace Elevators - Morrison & Riley Robb Hall SUCF #161042 - APPARENT LOW
Description: 1. Morrison Hall - Passenger elevator replacements a. Replacement of two (2) five stop passenger elevators each within its own phase. b. Architectural, structural, mechanical, and electrical work associated with elevator replacement. c. Asbestos abatement required for elevator replacement. d. Smoke mitigation modifications within each elevator machine room. Smoke hatch installations to be completed prior to new elevator equipment placement. e. All applicable code updates. 2. Riley-Robb Hall - Passenger elevator replacement a. Replacement of one (1) five stop passenger elevator within its own phase. b. Architectural, structural, mechanical, and electrical work associated with elevator replacement. c. Asbestos abatement required for elevator replacement. d. Smoke mitigation modifications within elevator machine room. e. All applicable code updates.
Bid Due: January 18th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1 |Addendum 2
Project Estimator: Devon Clark x6364
Submit Quote to: Quotes@StreeterAssociates.com

Cornell VMC Linear Accelerator Replacement & Infrastructure Upgrades - AWARDED
Description: Replace the existing Linear Accelerator located in Room C2289C of the College of Veterinary Medicine, including upgrading the associated mechanical, plumbing, electrical, and architectural elements. Upgrades will include a new AHU set on top of the roof, new conduit pathways between equipment, setting a new chiller and power conditioning unit the mechanical space below, and providing new casework and furniture within the radiation oncology suite (Rooms C2289, C2289A, C2289B, C2289C). Close coordination will be required between the Owner, Contractor/subcontractors, and the equipment vendor to ensure that delivery timelines are kept and equipment can be commissioned in the correct order.
Bid Due: January 16th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Pre-bid Meeting Minutes |Addendum 1
Project Manager: Brian Paul x6359
Submit Quote to: Quotes@StreeterAssociates.com

Waverly CSD Additions and Alterations - Phase 2 - AWARDED
Description: General Construction Contract. The project will include additions and alterations to the Waverly Junior and Senior High School Building located at 440 Park Ave, Waverly, NY 14892. See project documents for details and scope of work.
Bid Due: December 12th at 3:00PM
Project Drawings (Volume 1): Download
Project Drawings (Volume 2): Download
Project Specifications (Volume 1): Download
Project Specifications (Volume 2): Download
Addenda: Addendum 1 | Addendum 2 | Addendum 3
Project Manager: Mark Stirpe x6357
Submit Quote to: Quotes@StreeterAssociates.com

Pi Beta Phi Exterior Renovations - Phase 2 - AWARDED
Description: Owner: House Corporation, New York Delta of Pi Beta Phi. Project Location: Pi Beta Phi (330 Triphammer Road | Ithaca, New York 14850). Scope: The Work of the Project is defined by the Contract Documents and consists of the following, asbestos abatement at first floor windows, selective demolition, masonry restoration, rough carpentry, finish carpentry, roof drainage (gutters and downspouts) replacement, exterior stucco/plaster replacement and repairs, wood soffit and eave repairs, soffit vent restoration, window replacement (basement and first floors), interior and exterior painting, exterior light fixture replacement and other Work indicated in the Contract Documents.
Bid Due: December 6th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: No Addenda
Project Manager: Josh Mosolf x6360
Submit Quote to: Quotes@StreeterAssociates.com

Tompkins County Recycling Center Infrastructure Upgrade Project - AWARDED
Description: The project includes renovations to the recycling office locker rooms and break room, repairs to facility concrete on the tipping floor, and replacement of the recycling office HVAC unit to Tompkins County Recycling and Solid Waste Center located at 160 Commercial Avenue Ithaca Tompkins NY 14850.
Bid Due: December 5th at 2:00PM
Project Document (Issued with Original Release): Download
Project Specifications (Re-Issued as Addendum 1): Download
Project Drawings (Re-Issued as Addendum 2): Download
RFI Answer (Issued as Addendum 3): Download
Addenda: Addendum 4 | Addendum 5 | Addendum 6 | Addendum 7 | Addendum 8 | Addendum 9
Project Manager: Luke Brown x6384
Submit Quote to: Quotes@StreeterAssociates.com

Bolton Point Water Treatment Facility Electrical Upgrades - South Cayuga - AWARDED
Description: Contract 1A - General Construction. The Project consists of: 1. A new Electrical Building with approximate dimensions of 40' x 20'. 2. HVAC for new Electrical Building. 3. Replacement of existing exhaust fans and starters in existing electrical room. 4. Site work for installation of new building and electrical equipment. 5. New switchgear and associated circuiting to replace existing 480V, 3000A equipment. 6. Installation of Owner-supplied equipment including a 750kW generator, 2.5MVA transformer, and Automatic Transfer Switch. 7. New 35kV gang operated air break switch on existing structure. 8. Start-up and commissioning of the improvements.
Bid Due: November 17th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2 | Addendum 3 | Addendum 4
Project Manager: Luke Brown x6384
Submit Quote to: Quotes@StreeterAssociates.com

Vestal CSD Robotics Upgrade and IT Closet - AWARDED
Description:
Bid Due: October 17th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: No Addenda
Project Manager: Ian Tuttle x6372
Submit Quote to: Quotes@StreeterAssociates.com

Cornell University Veterinary Research Tower Second and Third Floor Structural Repairs and Laboratory Remediation - AWARDED
Description: Repair all structural damage caused by the fire on the 2nd Floor of the VRT. Restore the 2nd and 3rd floor laboratories in the VRT to their pre-fire state.
Bid Due: October 17th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1
Project Manager: Josh Mosolf x6360
Submit Quote to: Quotes@StreeterAssociates.com

City of Ithaca New Fire Station - AWARDED
Description: Contract 01 - General Construction. The project consists of an approximately 13,400 square-foot new fire station located at 403 Elmwood Avenue, Ithaca, NY. See project document for details and scope of work.
Bid Due: September 21st at 2:00PM
Project Drawings: Download
Project Specifications (Volume 1): Download
Project Specifications (Volume 2): Download
Addenda: Addendum 1 | Addendum 2 | Addendum 3
Project Manager: John Mahon x6364
Submit Quote to: Quotes@StreeterAssociates.com

Cornell War Memorial Phase 2 Restoration - AWARDED
Description: The restoration includes a full masonry repair program, including replacement of decorative carved stone elements. The slate roof is scheduled for replacement including its flashing and rainwater collection and drainage. The concrete utility tunnel that forms the foundation for the cloister that runs between the two residential halls is in poor condition and requires extensive repairs. Also included in the scope is lighting and paving upgrades. The steps down to the plaza will be rebuilt and a new handrail will be installed.
Bid Due: September 6th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2 | Addendum 3
Project Manager: Josh Mosolf x6360
Submit Quote to: Quotes@StreeterAssociates.com

Elmira CSD Elementary Schools 2023 Renovations - IN PROGRESS
Description: General Trades Contract. Various tyes of work at Beecher Elementary, Broadway Academy, Coburn Elementary, Fassett Elementary, Hendy Elementary and Pine City Elementary School. See project documents for details and scope of work.
Bid Due: June 29th at 2:00PM
Project Drawings (Vol 1): Download
Project Drawings (Vol 2): Download
Project Specifications (Vol 1): Download
Project Specifications (Vol 2): Download
Addenda: Addendum 1 | Addendum 2
Project Manager: Mark Stirpe x6357
Submit Quote to: Quotes@StreeterAssociates.com

Owego Marvin Park Improvements - IN PROGRESS
Description: This project will completely re-build the bathroom facilities, re-surface the existing basketball and tennis court, repair the pillars at the entrance, add signage, replace fencing along Main Street, improve the walking trail, add to the existing playground and resurface the play area to new standards, and completely rebuild the skate park with a "cast in place" concrete design. This project is in final design and will be bid out to prospective contractors near the end of February for spring construction. This multiple prime project was previously advertised and bid. Bids for Electrical and Plumbing contracts have been accepted. This rebid is for the General Trades contract only. Bid Due: June 15th at 1:00PM
Project Drawings (Set 1): Download
Project Drawings (Set 2): Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2
Project Manager: Lloyd Friedah x6392
Submit Quote to: Quotes@StreeterAssociates.com

Vestal Memorial Pool Reconstruction - IN PROGRESS
Description: Contract No. 1A – General Construction: This work shall include providing all labor, materials, machinery, tools, equipment, and other means of construction necessary and incidental to the completion of the Memorial Pool Renovations. The project includes the work shown on the Plans, and described in these Specifications consisting of general construction. General construction includes, but is not limited to, the following: Demolition of the existing main pool and wading pool, pool deck, bathhouse, pump house and accessories buildings, including all fixtures, piping, domestic hot water heating system, interior and exterior walls and partitions, roof, pool filtration and treatment equipment, asbestos containing materials and other related items. Work shall also include new main pool with supply and drainage system, pool filtration and treatment equipment, pool deck, pool accessories, splash pad with associated controls, piping and drainage system, perimeter fence, shade canopies, new asphalt parking, concrete sidewalks, lawn areas, and other related items. Work shall also include new bathhouse with metal roofing, cmu block walls, interior partitions and finishes, flooring, ceilings, ADA compliant bathrooms, overhead door, man doors, windows, and new pump house with overhead door and man doors, flooring, sump areas, and storage to accommodate the new pool filtration and treatment system, and all other related items.
Bid Due: June 6th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1
Project Manager: Brian Edwards x6359
Submit Quote to: Quotes@StreeterAssociates.com

Cornell University Sage Hall Foundation Waterproofing - IN PROGRESS
Description: 1. Excavate and remove existing waterproofing and drainage piping along the entire west side and wrapping around to the halfway point on the south side. Install new waterproofing and drainage board, new foundation drain piping, clean out and spillway; backfill, finish grading and seeding. 2. Remove existing concrete step, landing and sidewalk at west entrance. Replace with new granite steps. Remove existing south stair and salvage cheek walls for reuse. Provide new foundation to support steps and landing, install new stone steps and landing. Repair, reinstall and paint original iron handrails. 3. Excavate to expose existing tunnel structure and remove existing waterproofing and insulation. Remove, label and salvage existing stone veneer for reuse. Remove existing entrance doors, frame, transom, and hardware. Install new membrane waterproofing, drainage board and rigid insulation over tunnel. Install new foundation piping. Reinstall existing stone veneer, light, add new scuppers, install new doors, frame, transom, and hardware. Patch and repair exiting lower concrete sidewalk. 4. Install new macro fiber re-enforced concrete sidewalks.
Bid Due: May 1st at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1
Project Manager: Mark Stirpe x6357
Submit Quote to: Quotes@StreeterAssociates.com

Cornell University Replace Utilities Tower Road East Green Greenhouse - IN PROGRESS
Description: 1. Replace existing autoclave and associated utilities with new electric steam generated autoclave consisting of steam boiler and accessories. New RO skid shall be installed as shown on drawings to serve electric steam boiler. 2. Modifications to existing autoclave enclosure CMU walls and roof as specified on the drawings. 3. Electrical modifications to support new electric steam generated autoclave. SUCF #161046.
Bid Due: March 16th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2
Project Manager: Brian Edwards x6359
Submit Quote to: Quotes@StreeterAssociates.com

SUNY Alfred (State) Water Treatment Bldg. and Elevated Storage Tank - IN PROGRESS
Description: The work of this single bid project includes construction of a new water treatment building, new elevated concrete water storage tank, and new pre-chlorination building. Replace underground utilities and structures, an provide regrading, concrete pavement, asphalt pavement, and plantings.
Bid Due: August 3rd at 2:00PM
Project Drawings: Download
Project Specifications (Volume 1): Download
Project Specifications (Volume 2): Download
Addenda:Addendum 1 |Addendum 2
Project Manager: John Mahon x6356
Submit Quote to: Quotes@StreeterAssociates.com

Cornell Balch Hall Concrete - IN PROGRESS
Description: Please use the link below to access all Plan and Spec Documents, as well as all current Bulletins and RFi Responses.
ALL UPDADTED PROJECT DOCUMENTS: HERE
Project Manager: Brian Edwards x6359
Submit Quote to: Quotes@StreeterAssociates.com

Chemung County WWTP Consolidation Project - IN PROGRESS
Description: General-Regional Contract (4A). Chemung County # RFB-2434. A. The Work is located at the Chemung County Sewer Districts Lake Street and Milton Street Wastewater Treatment Plants (WWTP) as well as at the proposed site of the Siphon Discharge and Flow Transfer Structure. The Lake Street WWTP is located at 1700 Lake Street, Elmira, New York, 14901. The existing Milton Street WWTP and future Regional WWTP is located at 600 Milton Street, Elmira, New York, 14904. The Siphon Discharge and Flow Transfer Structure is accessed from Luce Street DEC Boat Access east of Dunn Field. See project documents for details and scope of work.
Bid Due: August 11th at 1:45PM
Conformed Drawings (General): Download
Conformed Drawings (Demolition): Download
Conformed Drawings (Civil): Download
Conformed Drawings (Structural): Download
Conformed Drawings (Architectural): Download
Conformed Drawings (Insturmentation): Download
Conformed Drawings (Fire Protection): Download
Conformed Drawings (Plumbing): Download
Conformed Drawings (Process Mechanical): Download
Conformed Drawings (HVAC): Download
Conformed Drawings (Electrical): Download
Conformed Specifications (Volume 1): Download
Conformed Specifications (Volume 2): Download
Conformed Specifications (Volume 3): Download
Conformed Specifications (Volume 4): Download

Project Manager: Lloyd Friedah x6392
Submit Quote to: Quotes@StreeterAssociates.com

SUNY Geneseo Sturges Hall - Abatement and Replace Windows - IN PROGRESS
Description: SUCF Project No 061016-01 (Single Prime). The main features of the work includes removing existing window, frame, trim and hardware as noted on the drawings to install new premium aluminum clad wood windows to match existing window divisions and profiles. Removal of existing elevator and installation of new aluminum framed skylight. Abatement work as demolition to Remove existing plaster from masonry backup. Replace existing clay speed tile with new as required after plaster removal. Removal of existing walls and ceilings as noted on the drawings. Patch and repair existing wall and adjacent finishes to remain to match existing. Patch and repair floor substrate to receive new floor in future project. Removal of all existing drop ceilings. Removal of existing floor finish as noted on the drawings. Patch and repair floor substrate to receive new floor in future project. Remove existing interior door, frame, trim, and hardware as noted on the drawings. Carefully remove existing historic wood clocks and turn over to the college for storage. Removal and replacement of existing roof drains and leaders. Install new metal flashing coating system at gutter. Removal and replacement of Main Stair Tower EPDM roof. Repair existing concrete areaways and remove and replace metal grates. Clean existing exterior limestone and granite. Patch incidental areas of loose material at all elevations. Repoint existing exterior brick. Replace damaged exterior brick with replacement brick of similar color and size. Repoint existing exterior limestone and granite. Removal of existing mechanical, plumbing, fire protection and electrical systems as noted on the drawings and provide temporary heating, lighting and fire alarm to be left in place at completion of project.
Bid Due: July 26th at 2:00PM
Project Drawings: Download
Project Specifications (Volume 1): Download
Project Specifications (Volume 2): Download

Addenda: Addendum 1 | Addendum 2 | Addendum 3 | Addendum 4 | Addendum 5
Project Manager: Ian Tuttle x6372
Submit Quote to: Quotes@StreeterAssociates.com

Binghamton Armory Replace Windows and Roofs - IN PROGRESS
Description: General Construction Contract, OGS Project # 47182-C. Replace Windows and Roofs G, J, C and E at the Binghamton State Armory located at 85 West End Avenue, Binghamton, New York. See project documents for details and scope of work.
Bid Due: July 13th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:No Addenda
Project Manager: Lloyd Friedah x6392
Submit Quote to: Quotes@StreeterAssociates.com

OGS Provide Restroom and Locker Room Addition Maintenance, Headquarters - IN PROGRESS
Description: General Construction Contract (OSG Project# 45260C). Provide Restroom and Locker Room Addition Maintenance Headquarters, DOT Region 6, Schuyler County, 3545 County Route 16, Watkins Glen (Schuyler County), NY. See project documents for details and scope of work.
Bid Due: July 6th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1 |Addendum 2
Project Manager: Mark Stirpe x6357