Recently Awarded Projects

Below are projects were recently awarded (or Streeter Associates is the apparent low bidder). If you have any questions about these projects, please call (607) 734-4151 and ask to speak to the Estimator that is handling the project that you are interested in. If you have any problems downloading the project documents, contact Rob Stanton at (607) 734-4151 extension 6354. Use the link to the right to see a list of projects that we are currently bidding.

Maine Endwell CSD 2019 Capital Improvements Phase 1 - GC CONTRACT 1 REBID - AWARDED
Description: General Construction No. 1: 2020: Gym, 5/4/20 to 10/17/20, 2020: Ceilings For HVAC, 2021: Classroom Addition, 6/21/21 to 10/8/21, 2021: Ceilings for HVAC. General Construction No. 2 All Scope in High School, Middle School & Maine Memorial Elementary. 2020: All work completed by 8/29/20. SED #s 03-11-01-06-0-001-018 – HOMER BRINK ELEMENTARY, 03-11-01-06-0-008-017 – MAINE MEMORIAL ELEMENTARY, 03-11-01-06-0-010-025 – SENIOR HIGH SCHOOL, 03-11-01-06-0-015-017 – MIDDLE SCHOOL, 03-11-01-06-5-003-009 – BUS GARAGE.
Bid Due: March 12th, 2020 at 1:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2 | Addendum 3 | Addendum 4 | Addendum 5 | Addendum 6 | Addendum 7 | Addendum 8 | Addendum 9
Project Estimator: Nick Fabrizi x6364

Cornell Anna Comstock Hall Bathroom Renovations - AWARDED
Description: The purpose of this project is to remove the existing shower/bathtub unit and replace with a new walk-in shower enclosure in eighteen bathrooms within the Anna Comstock Hall Complex. Besides the shower enclosure and base, the project will include repair/replacement of wall finishes, floor finishes, replacement of wall mounted mirror, replacement of light fixture with new LED wall mounted fixture, disconnecting / connecting existing plumbing fixtures, replacement of shower/bathtub controls with hand held shower unit, minor relocation of some water closet toilet fixtures, and installation of new sprinkler heads.
Bid Due: March 10th, 2020 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1
Project Estimator: Josh Mosolf x6360

OGS Southport Correctional Facility Replace Doors, Housing Blocks 4, 5 & 6. - AWARDED
Description: General Costruction contract to replace doors in Housing Blocks, Buildings 4, 5 and 6 at Southport Correctional Facility in Pine City, New York. See project documents for scope of work and project details. OGS Project Number 44676-C.
Bid Due: March 4th, 2020 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: No Addenda
Project Estimator: Lloyd Friedah x6392

OGS Cayuga Correctional Facility Classrooms and Office Space - AWARDED
Description: Provide Classrooms and Office Space, Building 38. Residential Unit at Cayuga Correctional Facility, 2202 State Route 38A, Moravia, New York. See project documents for Details and Scope of Work. OGS Project Number 46130-C.
Bid Due: March 4th, 2020 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2
Project Estimator: Nick Fabrini x6364

Cornell War Memorial Restoration - AWARDED
Description: 1. Masonry restoration and repair of the War Memorial. a. Repair of detailed masonry structures. b. Selective replacement of damaged masonry elements. c. Repointing of masonry. d. Cleaning and removal of deicing salts. Selective cleaning of other areas. e. Crack repair and stone reinforcement. f. Installation of sealant at joints as noted. 2. Sequential replacement of the concrete structural slab of the War Memorial / ceiling of the utility tunnel. a. Relocation / replacement of utilities impacted by the slab replacement, including but not limited to the following: heating hot water, campus steam, domestic water, fire service water, fire suppression, electrical,telephone/data, and fire alarm systems. - Replacement of existing fire department connection. b. Installation of new waterproofing and drainage systems for new structural slab. c. Installation of new stone pavers. 3. Replace slate roofing, membrane roofing, flashing and gutter systems. a. Selective replacement and reinforcement of damaged roof framing members. b. New access hatch at flat roof. 4. Replace lighting with the War Memorial. Provide new landscape lighting in area adjacent to the War Memorial. 5. Installation of new railing at stairs.
Bid Due: Febraury 20th, 2020 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2
Project Estimator: Kevin Burnett x6365

Maine Endwell CSD 2019 Capital Improvements Phase 1 - AWARDED (GC CONTRACT 2)
Description: General Construction No. 1: 2020: Gym, 5/4/20 to 10/17/20, 2020: Ceilings For HVAC, 2021: Classroom Addition, 6/21/21 to 10/8/21, 2021: Ceilings for HVAC. General Construction No. 2 All Scope in High School, Middle School & Maine Memorial Elementary. 2020: All work completed by 8/29/20. SED #s 03-11-01-06-0-001-018 – HOMER BRINK ELEMENTARY, 03-11-01-06-0-008-017 – MAINE MEMORIAL ELEMENTARY, 03-11-01-06-0-010-025 – SENIOR HIGH SCHOOL, 03-11-01-06-0-015-017 – MIDDLE SCHOOL, 03-11-01-06-5-003-009 – BUS GARAGE.
Bid Due: Febraury 18th, 2020 at 1:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2 | Addendum 3 | Addendum 4 Addendum 5 | Addendum 6
Project Estimator: Nick Fabrizi x6364

Cornell High Rise 5 Upgrades Code Remediation - AWARDED
Description: 1. Replacement of non-code compliant bedroom suite doors, frames, and hardware with code compliant doors, frames, and hardware. 2. Replacement of non-code compliant stair and balcony guardrails and handrails with code compliant guardrails and handrails. 3. Modifications to walls as required for code remediation work. 4. Painting of student bedrooms. 5. Installation of new wayfinding signage. 6. Asbestos abatement as required for code remediation work and student bedroom window blind replacement. 7. Mechanical fire/smoke damper installation at student bedroom suite door area locations. 8. Miscellaneous power, fire alarm, and area of refuge system installation as required for code remediation work.
Bid Due: Febraury 17th, 2020 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1
Project Estimator: Brian Edwards x6359

Cornell University Wilson Synchrotron Laboratory SLAC Power Supply and Autotransformer Installation - AWARDED
Description: 1. Install new, Owner-supplied Stanford Linear Accelerator (SLAC) power supply and autotransformer on to existing Wilson Synchrotron Laboratory outdoor transformer yard including: a. Foundation reinforcement in the cryogenic support room underneath the transformer yard consisting of steel beams, concrete foundations and concrete coring and steel framing for wall-mounted equipment. b. Concrete slab on grade. c. New electrical service and control wiring including 13.2kVAC, 60kVDC, 208VAC, control power and control signals. d. New illuminated exit signs and emergency lighting packs. e. Install two new egress frames and doors leading from the transformer yard to the 4th story mechanical room including outdoor awning above east door. f. Storm water main replacement inside of the cryogenic support room.
Bid Due: January 15th, 2020 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 Addendum 2
Project Estimator: Brian Edwards x6359

Canisteo-Greenwood CSD Capital Improvements Project - AWARDED
Description: Renovation and addition work on High School, Elementary School Bus Garage and Concession Stand. See project documents for project details and scope of work.
Bid Due: December 19th, 2019 at 3:30PM
Project Drawings: Download
Project Specifications (Volume 1): Download
Project Specifications (Volume 2): Download
Addenda: Addendum 1 | Addendum 2 | Addendum 3
Project Estimator: Nick Fabrizi x6364

Lansing CSD Additions, Alterations and Reconstruction - AWARDED
Description: General Construction Contract for the Additions and Alterations to Elementary School, Reconstruction to High School, Middle School, Technology Building, Former District Office, Grounds Building, Bus Maintenance Garage. Please review the project documents for the scope of work and project details. SED NOs. 61-08-01-04-0-003-018, 61-08-01-04-0-004-026, 61-08-01-04-0-001-021, 61-08-01-04-0-002-006 ,61-08-01-04-1-005-005, 61-08-01-04-3-013-003 and 61-08-01-04-5-006-011.
Bid Due: December 3rd, 2019 at 3:00PM
Project Drawings: Download
Project Specifications (Volume 1): Download
Project Specifications (Volume 2): Download
Addenda: Addendum 1
Project Estimator: Mike Muldoon x6387 and Brian Paul x6372

Rehabilitate Elevators Elmira Psych Center (OGS) - AWARDED
Description: General Construction Contract (M3119-C) for the rehabilitation of elevators in Buildings 3, 4, 5, 6, 7, and 9 of the Elmira Psychiatric Center at 100 Washington Street in Elmira.
Bid Due: November 20th, 2019 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2
Project Manager: John Mahon x6356

Arnot Health Emergency Department Renovation and Expansion - AWARDED
Description: The Work includes renovation and addition to the existing Emergency Department, which includes includes an Observation Unit, Administration Wing, new Lobby,Waiting Area, and new drop-off and ambulance canopies.
Bid Date: October 31st, 2019
Project Drawings (General): Download
Project Drawings (Demolition): Download
Project Drawings (Civil): Download
Project Drawings (Structural): Download
Project Drawings (Architectural): Download
Project Drawings (HVAC): Download
Project Drawings (Plumbing): Download
Project Drawings (Fire Protection): Download
Project Drawings (Electrical): Download
Project Drawings (Technology): Download
Project Drawings (Volume 1): Download
Project Specifications (Volume 2): Download
Project Specifications (Volume 3): Download
Addenda: Addendum 1 Addendum 2 Addendum 3
Project Manager: Mike Muldoon x6387

Cornell High Rise 5 Upgrades Elevator Replacement - AWARDED
Description: 1. Replacement of two elevators 2. Replacement of the Elevator Machine Room roof and the addition of a new roof hatch 3. Asbestos abatement associated with the elevator replacement 4. Structural modifications associated with the elevator replacement 5. Mechanical, electrical, and plumbing modifications to accommodate the elevator replacement.
Bid Due: October 23rd, 2019 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1
Project Estimator: Don Rottmann x6361

Cornell Barton Hall Floor Refinishing - AWARDED
Description: 1. Replace stair treads and risers on the three (3) west stairwells. 2. Paint stair structures. 3. Provide new resinous floor coating system on ground floor. 4. Provide entry area vestibule walk off carpet. 5. Provide temporary protections as required to complete the work.
Bid Due: September 12th, 2019 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2
Project Manager: John Jeter x6370

Cornell Snee Hall Mass Spectrometer Installation Ventilation - AWARDED
Description:Remove roof top exhaust fan that serves instruments in 4158B and 4160A and replace with a larger fan with a VFD. New fan will provide exhaust for existing and proposed instruments in rooms 4158B, 4160A and 4160B. Remove and replace as well as install new ductwork, coil, devices and control as shown on drawings to support the required ventilation for the 3 lab spaces.
Bid Due: September 3rd, 2019 at 2:00PM
Project Drawings: Download
Project Specifications (Asbestos Report): Download
Addenda: Addendum 1 | RFI Responses
Project Manager: Lloyd Friedah x6392

Tompkins County Sub-Residency Bldg & Site NYS DOT - AWARDED
Description: This project includes new building construction of the NYSDOT Tompkins County Sub-Residency Building as well as site development and construction that includes asphalt concrete pavement, drainage, water & sanitary sewer work. The new NYSDOT facility will consist of office space, workshop space, truck parking and salt storage. The approximate square footage of the various structures are as follows: subresidency maintenance building (30,000 SF), cold storage (5,000 SF), salt barn (8,200 SF), hopper building/covered lean-to (2,500 SF). NYS DOT #D264050
Bid Due: August 14th, 2019 at 10:30AM
Project Drawings: Download
Project Specifications (Volume 1): Download
Project Specifications (Volume 2): Download
Project Specifications (Volume 3): Download
Project Specifications (Volume 4): Download
Project Specifications (Volume 5): Download
Project Specifications (Volume 6): Download
Project Specifications (Volume 7): Download
Project Specifications (Volume 8): Download
Addenda: Amendment 1 | Amendment 2 | Amendment 3 | Postponed | Ammendment 4 | RFI Response 8-7-19 - Spec Sections 033543 and 124813 | Amendment 5 | Amendment 6
Project Manager: John Mahon x6356