Recently Awarded Projects

Below are projects were recently awarded (or Streeter Associates is the apparent low bidder). If you have any questions about these projects, please call (607) 734-4151 and ask to speak to the Estimator that is handling the project that you are interested in. If you have any problems downloading the project documents, contact Rob Stanton at (607) 734-4151 extension 6354. Use the link to the right to see a list of projects that we are currently bidding.

Cornell University Central Energy Plant (CEP) Physical Security Improvements - APPARENT LOW
Description: 1. Install 6' chain link security fence with barbed wire around CEP and the Acquis Ammonia tanks 2. Install two automated 20ft wide gates for access, with Card Access and a Knox box 3. Install vehicle sensing loops on either side of each Automated gate 4. Install seven, two panel gates for access through the fence perimeter 5. Install signage every 200ft along fence line 6. Install man gate and 6ft fencing on roof gangway of Humphreys service building
Bid Due: November 7th, 2018 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1
Project Estimator: Jim Niver x6365

Cornell Statler Ballroom and 2nd Floor Hood and Duct Remediation
Description: 1. Ballroom Renovation
- Full renovation/remodel of the existing 4,000 sf ballroom, which includes the pre-function area of 2250 sf as well as finishes along the connection corridor from the main lobby of approximately 1,000 sf.
- Remove existing dropped and hard ceilings in the Ballroom and other areas indicated. Demolish existing folding wall partition, track, and track supports.
- Provide new acoustical panel ceilings with access panels. Includes new LED lighting and ceiling mounted accessories like fire alarm devices, HVAC registers and grilles, and fire protection equipment. Provide new hard ceiling and acoustical plaster system.
- Demolish and install new carpet and base. Demolish existing wood wall trims, paneling and wall coverings and install new wall finishes.
- Provide projector lifts, projector screens, and electrical infrastructure (including conduits and backboxes) required for AV work. Provide new doors, frames, and hardware.
- Install new interior walls, fire rated shaft walls, and access doors.
- Provide new aluminum storefront window in new openings. Install new motorized window shades at new and existing windows.
- Provide all plumbing, electrical, mechanical, fire protection and low voltage systems required for a complete installation.
2. 2nd Floor Hood & Ducts Projects
- Remove existing ceiling grid and tile. Salvage select ceiling mounted fixtures for reinstallation.
- Provide new acoustical panel ceilings with access panels. Includes new LED lighting and ceiling mounted accessories like fire alarm devices, HVAC registers and grilles, and fire protection equipment.
- Demolish and install new concrete floor slab for new duct penetrations.
- Demolish existing quarry tile flooring and base and install new resilient sheet flooring and integral base.
- Provide metal deck, and concrete slab on deck roof penetrations to be filled.
- Provide EPDM roofing system.
- Install new interior walls, fire rated shaft walls, and access doors.
- Provide acoustical screen wall posts, panels, and connections to existing concrete slab.
- Provide metal post framed duct enclosure with integral gates and access points. Includes posts, accessories, louver panels, and connections to existing concrete slab.
- Provide all plumbing, electrical, mechanical, fire protection and low voltage systems required for a complete installation.
- Demolish existing Type 1 and 2 hoods and install new, and provide all associated horizontal and vertical exhaust ducts with clean-out access doors, electrical systems, and integral fire suppression system. Provide all programming and operations controls necessary for a complete installation.
- Demolish existing roof mounted exhaust fan and install new roof mounted exhaust fans.

Bid Due: November 2nd, 2018 at 2:00PM
Project Drawings (Ballroom): Download
Project Drawings (Kitchen): Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2
Project Manager: Chris Meuhl x6362

Ithaca Airport Passenger Terminal Expansion Project
Description: General Trades Contract for Ithaca Tompkins Regional Airport Passenger Terminal Expansion Phase I. See bid documents for Scope of Work.
Bid Due: August 3rd, 2018 at 1:00PM
Project Drawings: Download
Project Specifications(Volume 1): Download
Project Specifications(Volume 2): Download
Project Specifications(Volume 3): Download
Project Specifications(Volume 4): Download
Geotech Report 7-12-18: Download
Geotech Report April 2018: Download
Geotech Report 2014 Download
Passenger Terminal 1992: Download
Airport Security Improvements: Download
Entrance Road and Parking Lot: Download
Addenda: Addendum 1 | Addendum 2 | Addendum 3 | Addendum 4
Project Manager: Mark Stirpe x6357

Cornell Statler Hall & Hotel Elevator Modernization & Fire Alarm Upgrade
Description: 1. Modernization of (4) four traction elevators identified as Elevator #1, #2, #3, and #5. Includes upgrades to supporting mechanical, electrical, plumbing, fire alarm, tele-communications, and security systems associated with the elevators. 2. Minor upgrades to Fire Service key switches associated with Elevator #4, #7, and #9 to comply with current code. 3. Upgrade of the existing fire alarm system located in the Fire Control Room 129. Includes replacement of the head-end equipment, testing of the upgraded system, new addressable loops for future expansion, and new addressable fire alarm devices supporting the elevator systems. Final connections to be provided between fire alarm sub-panels and Owner provided conduits.
Bid Due: June 21st, 2018 at 3:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: No Addenda
Project Manager: Brian Edwards x6359

Watkins Glen | Montour Falls Regional Wastewater Treatment Facility - AWARDED
Description: Contract 2: Construction of a new municipal wastewater treatment plant, including administration building, headworks, sequencing batch reactor system, tertiary filter, UV disinfection, and appurtenances as detailed in the contract documents
Bid Due: February 7th, 2017 at 1:00PM
Project Drawings: Download
Project Specifications (Volume 1 - Part 1): Download
Project Specifications (Volume 1 - Part 2): Download
Project Specifications (Volume 2): Download
Project Specifications (Volume 3): Download
Addenda: Posted plans and specs include all addenda|
Project Manager: Chris Muehl x6362

OGS NYS Fire Science Field Operations Building - AWARDED
Description: General Trades Contract to construct a new Field Operations Building at the New York State Fire Academy in Montour Falls, New York. See project documents for for details on the scope of work.
Bid Due: March 14th, 2018 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: No Addenda
Project Estimator: Mike Muldoon x6387