Recently Awarded Projects

Below are projects were recently awarded (or Streeter Associates is the apparent low bidder). If you have any questions about these projects, please call (607) 734-4151 and ask to speak to the Estimator that is handling the project that you are interested in. If you have any problems downloading the project documents, contact Rob Stanton at (607) 734-4151 extension 6354. Use the link to the right to see a list of projects that we are currently bidding.

Cornell Renovation of Olin Hall for Chemical and Biomolecular Engineering Phase I - AWARDED
Description: This project will renovate approximately 8,500 GSF on the second and third floor of Olin Hall on the Cornell Campus. Along with this full renovation is the minimal renovations to Floor 1 and Floor 4 to enable the units currently occupying the second and third floor space to move into Floor 1 and Floor 4. The main portion of the project involves the demolition of interior space that is primarily dry lab and office space and covert that space into wet chemical laboratories. This will involve a total interior demolition and reconstruction of the space to meet the requirements of the Department. Additional mechanical areas that will be addressed are an air intake and air handling unit at the basement level and exhaust fans on the roof of Level 4.
Bid Due: January 15th, 2019 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2
Project Manager: Lloyd Friedah x6392

Cornell Langmuir Lab Freight Elevator Modernization - APPARENT LOW
Description: Replacement, repair, and refurbishment of elevator controls, elevator car, door frames and switches; including sump pump and accessories in elevator shaft.
Bid Date: January 18th, 2019 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2
Project Manager: TBA

SUNY Cortland Moffett Center Phase 2 - APPARENT LOW
Description: This 72,000 sf renovation to the Moffett Center will include a complete modernization of the facility, updating classrooms and faculty offices and converting the existing gymnasium to classroom and collaborative space.
Bid Due: January 17th, 2019 at 3:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 1 Rev 1 | Addendum 2 | Addendum 3 | Addendum 4 | Addendum 5 Addendum 6
Project Manager: TBD

Watkins Glen | Montour Falls Regional Wastewater Treatment Facility - AWARDED
Description: Contract 2: Construction of a new municipal wastewater treatment plant, including administration building, headworks, sequencing batch reactor system, tertiary filter, UV disinfection, and appurtenances as detailed in the contract documents
Bid Due: February 7th, 2017 at 1:00PM
Project Drawings: Download
Project Specifications (Volume 1 - Part 1): Download
Project Specifications (Volume 1 - Part 2): Download
Project Specifications (Volume 2): Download
Project Specifications (Volume 3): Download
Addenda: Posted plans and specs include all addenda|
Project Manager: Chris Muehl x6362